Jordan Crater
Other · 1992 · 1,481 acres
Max Debris Flow Probability
98%
Total Debris Volume
803 m³
Sub-watersheds Analyzed
20
Max Flow Velocity
7.6 m/s
Max Flow Depth
1.9 m
About This Assessment
TORRENT computed debris flow hazard for the Jordan Crater fire using physics-based models on real USGS 3DEP terrain data (10m resolution). The analysis covers 20 sub-watersheds across 4 design storm scenarios (2-yr, 10-yr, 25-yr, 100-yr return periods) using USGS logistic regression (Staley et al. 2017) for probability and Gartner et al. (2014) for volume estimation.
Other Other Wildfire Assessments
- Bowns Roost (2005) — 3,881 acres
- Wood (2007) — 3,881 acres
- Buck Creek (2016) — 3,880 acres
- Chichitnok River (2015) — 3,879 acres
- Meadow (2008) — 3,876 acres
- Kelly Point (2005) — 3,875 acres
- Ruby (1992) — 3,873 acres
- Palmer (2017) — 3,872 acres
- 900 (2017) — 3,871 acres
- Sublett Res (2001) — 3,871 acres